Magnolia Pointe – Road Resealing Project – Almost Completed

THE POOL IN THE CUSTOM SECTION IS NOW OPEN!!

IMPORTANT NOTICE TO MAGNOLIA POINTE HOMEOWNERS:

ROAD RESEALING IN MAGNOLIA POINTE IS SCHEDULED TO BEGIN ON MONDAY, MAY 4, AND END MAY 25!
• SCHEDULE WILL BE POSTED AND UPDATED ON www.mymagnoliapointe.com
• PLEASE STAY OFF ROAD FOR 36-48 HOURS PREFERRED.

NO DELIVERIES: MAIL, AMAZON, UPS, FED EX, etc., or TRASH ON YOUR SCHEDULED DAY/DAYS.

•YOU MUST PARK VEHICLES OUTSIDE PAVING AREA The NIGHT BEFORE! Parking restrictions are rescinded for the month of May.
• RESEAL MAY START AS EARLY AS 6:30 a.m., BASED ON WEATHER CONDITIONS.
• IF YOUR SCHEDULED DAY IS CANCELLED, IT WILL MOVE TO THE END OF THE SCHEDULE.
• YOUR STREET MUST BE FREE OF LANDSCAPING DEBRIS. NO CONTRACTORS WILL BE PERMITTED ON THE ROADS DURING PROJECT.
• IRRIGATION MUST BE SHUT OFF ONE DAY PRIOR TO YOUR SECTION GETTING SEAL COATED AND 2 DAYS AFTER THE SEAL COAT.

 

MAGNOLIA PT. BLVD. FROM THE GUARDHOUSE TO HWY 50 – PLEASE USE CAUTION AS THE ENTRANCE AND EXIT WILL BE RESEALED

 

RESCHEDULED – JUNE 8 (weather permitting)

FOUNTAINBLEAU DR. TO PROMENADE TO INCLUDE MONET CT. – FOUNTAINBLEAU DR.  TO END AND PICASSO TO PROMENADE DR.

ENTIRE NEIGHBORHOOD ROADS WILL BE MARKED PRIOR TO RE-SEAL !!

PRODUCT INFORMATION: https://www.gemsealproducts.com/wp-content/uploads/2016/05/polytar-sds.pd

     ROAD RESEAL MAP

FREQUENTLY ASKED QUESTIONS:

Q. Please advise reason for staying off roads for 36-48 hours. What about medical
appointments?
A. The cure time is 24 hours after application. If they start at 7 am and finish at 3pm then 24
hours is 3pm the next day plus the time it takes to apply, about 8 hours. That is at least 32 hours.
The advice of the vendor, we chose 36. Optimum cure time from manufacturer is 48.
Q. What if we have deliveries arriving? Will they be held at gate?
A. No deliveries will be allowed on the roads that are being sealed. Sorry, the guards cannot
accept packages. You may want to consider Amazon, FED EX and the USPS delivering to the UPS
Store in the Publix Shopping Center on Hwy. 50 in Clermont.
Q. Is the material used for resealing toxic to pets? Please provide MSDS information.
A. Attached is the link to the product sheets that we have received relative to the re-seal product.
Pets should be kept away from the surface.
Q. What is the plan for the twice weekly trash pick-up and recycle pick up?
A. Trucks will not be able to drive on the roads during re-seal. The pick-up will be delayed to the
next scheduled pick-up date.
Q. What is the plan for deliveries that you really have little to no control of that during this Covid crisis
could be critical for some residents? For example, deliveries that may include medications by mail
service, oxygen deliveries, groceries and items some residents absolutely cannot go out to pick-up
anywhere and have set-up as deliveries.
A. Vehicles that drive on the roads before they are cured will damage the roads. Please schedule
deliveries around your application date. Emergency vehicles cannot be delayed and will be
allowed in.

 

Both comments and pings are currently closed.

Comments are closed.